2000
|
|
![](images/hhl_arrows_01.jpg) |
The Guangzhou East-South-West Ring Road commenced operation. |
|
|
|
![](images/about_us/milestones/hhl_au_milestones_2000_01_s.jpg) |
|
|
|
1997
|
|
![](images/hhl_arrows_01.jpg) |
Boca Tigris Bridge opened for traffic. |
![](images/hhl_arrows_01.jpg) |
The Group sold its interest in CEPA to Southern Energy Asia Inc., a subsidiary of the New York-listed The Southern Company of the United States. |
|
![](images/about_us/milestones/hhl_au_milestones_1997_01_s.jpg) |
|
|
|
1996
|
|
![](images/hhl_arrows_01.jpg) |
Shajiao 'C' 3 x 660MW Power Station was completed. |
![](images/hhl_arrows_01.jpg) |
The Pagbilao 2 x 367.5MW Power Station, Philippines's largest coal-fired power plant commenced operation. |
![](images/hhl_arrows_01.jpg) |
Nova Taipa Gardens (Phase 1) in Macau, one of the largest residential properties in Macau, was completed. |
|
|
|
|
|
1995
|
|
![](images/hhl_arrows_01.jpg) |
Hongkong International Trade & Exhibition Centre at Kowloon Bay commenced operation. |
![](images/hhl_arrows_01.jpg) |
Shunde Roads, the major road network in Shunde Municipality, opened for traffic. |
|
![](images/about_us/milestones/hhl_au_milestones_1995_01_s.jpg) |
|
|
|
1994
|
|
![](images/hhl_arrows_01.jpg) |
Guangzhou-Shenzhen Superhighway, the principal highway located in the Pearl River Delta region, opened the full alignment to traffic. |
|
|
|
![](images/about_us/milestones/hhl_au_milestones_1994_01_s.jpg) |
|
|
|
1993
|
|
![](images/hhl_arrows_01.jpg) |
Consolidated Electric Power Asia Limited ('CEPA') was formed and listed on the Stock Exchange of Hong Kong, raising US$800 million to develop and operate power generation projects throughout Asia. |
![](images/hhl_arrows_01.jpg) |
Navotas ' II ' 1 x 100MW Power Station in the Philippines commenced operation. |
![](images/hhl_arrows_01.jpg) |
Hopewell was awarded the Silver Award by the Community Chest. |
|
|
|
|
|
1992
|
|
![](images/hhl_arrows_01.jpg) |
Panda Hotel in Tsuen Wan was opened with over 1,000 rooms, the largest number of rooms hotel in Hong Kong. |
|
|
|
![](images/about_us/milestones/hhl_au_milestones_1992_01_s.jpg) |
|
|
|
1991
|
|
![](images/hhl_arrows_01.jpg) |
Huanggang Cross Border Inspection Complex at Shenzhen was completed. |
![](images/hhl_arrows_01.jpg) |
Navotas ' I ' 3 x 70MW gas turbine power station in the Philippines was completed. |
|
![](images/about_us/milestones/hhl_au_milestones_1991_01_s.jpg) |
|
|
|
|
|
|