Hopewell Holdings Limited was awarded International Business Award by DHL/SCMP Business.
1988
Slipform Engineering Limited, a subsidiary of the Group, was awarded the British Construction Industry Award for the completion of the Shajiao 'B' Power Station 11 months ahead of schedule.
1987
Shajiao 'B' 2 x 350 MW Power Station, the Group's first power station in the PRC was completed.
1985
Shenzhen Railway Station Customs and Frontier Inspection Building was completed.
1984
Hopewell pioneered the Build Operate Transfer (BOT) concept in the China Hotel project in the PRC, a method of operating joint ventures with local authorities. China Hotel, the first hotel project undertaken by the Group, opened in Guangzhou. The 5-star, 1,200 room hotel was then the largest and most modern hotel in the PRC.